Perbaikan rancangan tata letak lantai produksi di CV. XYZ

Nurhasanah, Nunung and Simawang, Bima Prasetya (2013) Perbaikan rancangan tata letak lantai produksi di CV. XYZ. Perbaikan Rancangan Tata Letak Lantai Produksi di CV. XYZ, 2 (2). pp. 81-90. ISSN 2355-8059

[img] Text (Article's Content)
ILS0096-23_Isi-Artikel.pdf - Published Version

Download (396kB)
[img] Text (Plagiarism Check)
ILS0096-23_Cek-Turnitin.pdf - Supplemental Material

Download (2MB)
Official URL: https://jurnal.uai.ac.id/index.php/SST/article/vie...

Abstract

Layout of the facility as the planning and integration of the flow components of a product to get interelation the most effective and efficient among operators, equipment, and process of the transformation of material from the reception through to the delivery of finished products. This research aims to analyze and design the layout of the floor production facilities based on the minimum distance of displacement of material in CV.XYZ. Initialing we determined the product as a research object, then specify the number of machines with the theoretical Routing Sheet, after it was determined the number of actual machine with Multi Product Process Chart, then determine the area of the production floor, spacious warehouses, raw materials and finished goods warehouse area, then calculate the Material Handling Planning Sheet (MHPS) using Fuzzy Trapezoidal Layout approach, then make a From To Chart (FTC), then make the table a priority scale. To calculate the optimal design we need three methods, namely Relationship Diagramming Method, Hollier 1 Method, and the Hollier 2 Method and then results from the third such methods as compared to the results of the calculation of total distance and initial layout selected a rectilinear distance with the smallest result. The results of data processing in this research is total distance most efficient is the total distance smallest among early layout and also layouts proposal obtained by using third method is as much as 826,5 meters. Total distance displacement material between machine is 98.5 meters, using the relationship layout diagramming method.

Item Type: Article
Additional Information: TURNITIN's similarity index result was checked based on rules stated in "Pedoman Operasional Penilaian Angka Kredit Kenaikan Jabatan Akademik/Pangkat Dosen" (http://lldikti12.ristekdikti.go.id/wp-content/uploads/2019/03/PO-PAK-2019_MULAI-BERLAKU-APRIL-2019.pdf) pp. 23-25.
Uncontrolled Keywords: Layout, Floor Area, Distance, Material, Machine
Subjects: 600 Applied sciences & technology > 650 Management & public relations > 658 General Management
Depositing User: Rifda Jilan
Date Deposited: 07 Apr 2023 05:55
Last Modified: 02 May 2023 07:29
URI: http://eprints.uai.ac.id/id/eprint/2145

Actions (login required)

View Item View Item