Designing production scheduling with Fuzzy PERT to solve resource constraints through Lang’s Algorithm

Nurhasanah, Nunung and Harimansyah, Faikar Ridwan (2016) Designing production scheduling with Fuzzy PERT to solve resource constraints through Lang’s Algorithm. International Seminar on Industrial Engineering and Management, 9. pp. 45-50. ISSN 1978-774X

[img] Text (Article's Content)
ILS0131-23_Isi-Artikel.pdf - Published Version

Download (217kB)
[img] Text (Cover, Preface, Committee, Reviewer, Table of Content)
ILS0131-23_Halaman-Awal.pdf - Published Version

Download (1MB)
[img] Text (Plagiarism Check)
ILS0131-23_Cek-Turnitin.pdf - Supplemental Material

Download (1MB)
Official URL: https://isiem.net/9th-isiem-padang-indonesia/

Abstract

XYZ is a manufactured company which produces shoes. This company has scheduling problem. Machine utilization and labor management is not manage and schedule properly. It will become a threat in the future for this growing company. Recently, scheduling is running by owner’s intuition. Thus, this research applied Fuzzy PERT and Lang’s Algorithm in the company for scheduling production. This research used information from the company to make scheduling by production time, production process and expert judgement. Production time used to measure standard time in shoes production. Expert judgment used to Fuzzy PERT, so the production total time with expert judgement can be define. Then, that two production total time become a Lang’s Algorithm input. Thus, this research can define optimization level between labor with nowadays production time. The comparison is between standard total time and Fuzzy Pert total time. The results from data processing define with the Fuzzy PERT method, production total time can be reduce. Standard time for shoes production is 1946,48 seconds or 32,44 minutes. Fuzzy PERT production time is 1835,12 seconds or 30,59 minutes. Through Lang algorithm analysis, it is not necessary to increase number of labor, because the difference of total time between standard time and Fuzzy PERT is not too significant. The production scheduling use the results from Fuzzy PERT method because the production time can be reduce 111,36 seconds or 1,86 minutes. The scheduling use 35 labors and 22 work stations.

Item Type: Article
Additional Information: Presented in "The 9th International Seminar on Industrial Engineering and Management" held on 20-22 September 2016 in Grand Inna Muara Hotel Convention & Exhibition Padang - Indonesia.
Uncontrolled Keywords: standard time, optimization, production scheduling
Subjects: 600 Applied sciences & technology > 650 Management & public relations > 658 General Management
Divisions: Universitas Al-Azhar Indonesia (UAI) > Fakultas Sains dan Teknologi (FST) > Teknik Industri
Depositing User: Rifda Jilan
Date Deposited: 08 Apr 2023 03:03
Last Modified: 17 May 2023 08:51
URI: http://eprints.uai.ac.id/id/eprint/2180

Actions (login required)

View Item View Item