Productivity analysis to overcome the limited availability of production time in SME FBS

Nurhasanah, Nunung and Jingga and Aribowo, Budi and Gayatri, AM and Mardhika, DA and Tanjung, Widya Nurcahayanty and Suri, QA and Safitri, Riri and Supriyanto, Arif (2017) Productivity analysis to overcome the limited availability of production time in SME FBS. IOP Conference Series: Materials Science and Engineering, 277. pp. 1-8. ISSN 1757-899X

[img] Text (Article's Content)
ILS0130-23_Isi-Artikel.pdf - Published Version

Download (535kB)
[img] Text (Cover, Preface, Table of Content, Committee, Reviewer)
ILS0130-23_Halaman-Awal.pdf - Published Version

Download (771kB)
[img] Text (Plagiarism Check)
ILS0130-23_Cek-Turnitin.pdf - Supplemental Material

Download (1MB)
Official URL: https://iopscience.iop.org/article/10.1088/1757-89...

Abstract

Good industrial development should pay attention to the human factor as the main driver. Condition of work procedures, work area, and environment can affect the production result because if not optimal, the production will run slowly. If the work system is less than optimal, the productivity will do so, the operator will work uncomfortably and be easy to undergo work fatigue, even it can cause work accidents. Thus, the optimal and ergonomic arrangement of the the overall work system mechanism and work environment design is required for workers to work well, regularly, safely and comfortably with the aim of improving work productivity. This research measures the performance in textile SME (Small and Medium Enterprise) located in Sukabumi which is SME FBS which produces children's clothing. This performance measurement is aimed at improving the competitiveness of the textile IKM so that it has the equal competitiveness with other SMEs or with textile industries that already have their name in market. Based on the method of hour standard time and TOC calculation at 2 FBS CMT (Cut-Make-Trim) in Sukabumi, which are the CMT Margaluyu Village and CMT Purabaya Village, the result is that the standard time of shirt work on CMT Margaluyu Village is less than that of CMT Desa Purabaya. It can be seen that more effective in SME FBS production is by process method.

Item Type: Article
Additional Information: Presented in "The 10th International Seminar on Industrial Engineering and Management: Sustainable Development In Industry and Management" held on 7-9 November 2017 in Tanjung Pandan - Belitung, Indonesia; TURNITIN's similarity index result was checked based on rules stated in "Pedoman Operasional Penilaian Angka Kredit Kenaikan Jabatan Akademik/Pangkat Dosen" (http://lldikti12.ristekdikti.go.id/wp-content/uploads/2019/03/PO-PAK-2019_MULAI-BERLAKU-APRIL-2019.pdf) pp. 23-25.
Uncontrolled Keywords: Standard Time; Theory of Constraint; Productivity
Subjects: 600 Applied sciences & technology > 650 Management & public relations > 658 General Management
Divisions: Universitas Al-Azhar Indonesia (UAI) > Fakultas Sains dan Teknologi (FST) > Teknik Industri
Universitas Al-Azhar Indonesia (UAI) > Fakultas Sains dan Teknologi (FST) > Teknik Informatika
Depositing User: Rifda Jilan
Date Deposited: 08 Apr 2023 02:54
Last Modified: 17 May 2023 08:29
URI: http://eprints.uai.ac.id/id/eprint/2179

Actions (login required)

View Item View Item